Rotary Air Blast
Less disturbance.
More direction.
Move from surface anomalies to subsurface evidence with GroundTruth’s heli-portable, low-impact RAB drilling.
Planning early-stage exploration in Canada, the United States or Mexico? Talk to our team about your terrain, objectives and program requirements.
Moving a RAB drill site
Drill cage safety
The safety cage guards the drill string while it rotates, helping keep personnel clear of moving parts and prevent injuries. See the cage in use.
Setup and tear-down
Tearing down and packing up a drill site takes about one hour. Rebuilding and setting up the site takes about one hour as well.
11 sling loads for a complete site move
- Drill
- 3 loads
- Rod racks
- 3 loads
- Compressors
- 2 loads
- Equipment and tools
- 2 loads
- Fuel
- 1 load

Built for the first subsurface test
Test the anomaly.
Inform the next move.
- Method
- Rotary Air Blast (RAB)
- Application
- Shallow, early-stage exploration
- Depth
- Up to 200 m, depending on ground conditions
- Access
- Heli-portable
- Sample
- Rock chips
- Complementary data
- pXRF geochemistry · OTV surveys
Program scope, depth, access and production are assessed for your site. Request a project-specific proposal.
One program.
Connected evidence.
RAB drilling provides quick access to subsurface rock while minimizing surface disturbance. Chip samples help verify the anomalies identified through mapping, sampling and geophysics.
Same-day pXRF analysis supports geochemical screening. Optical televiewer surveys capture borehole-wall imagery for structural interpretation. Together, these observations help the exploration team make informed decisions in the field.
Need RC sampling or additional support? GroundTruth also provides RC drilling to depths of up to 150 m, depending on ground conditions, along with geologists, geotechnicians and drill-program staffing.
All drilling servicesYour next discovery starts here
Let’s put your
program in motion.
A complete exploration program or a specialist crew.
Tell us what you’re working toward.
Option 1 · Business Development
Plan your program